Laserfiche WebLink
<br /> <br />2 <br /> Mr. Norris said getting elevations for the main bridge would be helpful. He <br />expressed concern about bikes crossing the intersection at McIntire. <br /> <br /> Mr. Peery said that can be looked into, and noted that he thinks it is solvable. <br /> <br /> Mr. Norris asked if the trail could be moved to the other side, and Mr. Peery said <br />it could be done if it is closer in, and said they will look at that. <br /> <br /> Mr. O’Connell reviewed conditions included in the October 1, 2007 resolution <br />approved by Council conveying the temporary construction easement to VDOT. 1) <br />Certification from VDOT that the Commonwealth has acquired title to or a permanent <br />easement over 49.1 acres of real property that will be dedicated for use by the City as <br />replacement park land. Mr. O’Connell said he expects written certification to come in the <br />next month on this condition. 2) Review and approval by City Council of the final <br />design of the storm water drainage plan. Mr. O’Connell said the storm water design was <br />approved by Council on May 1, 2008. 3) Written confirmation from VDOT that this <br />temporary construction easement will not be used to construct an at-grade intersection at <br />the intersection of U.S. Route 250 Bypass and McIntire Road Extended. Mr. O’Connell <br />said he expects written certification to come in the next month on this condition. Mr. <br />O’Connell said that once the certification for #1 and #3 are received, the easement will be <br />signed. Mr. O’Connell said that consideration of the interchange design was the final <br />formal step. <br /> <br /> Mr. Huja said he hopes that with the changes to the interchange design that the <br />project will be within budget. He said the interchange still needs to be attractive since it <br />is an entrance into the City. <br /> <br /> Responding to a question from Ms. Edwards about the Hillcrest Road closing, Mr. <br />Norris said that the Hillcrest Road entrance onto Route 250 will have to close under any <br />scenario. <br /> <br /> The meeting was adjourned. <br /> <br />______________________________ ______________________________ <br />President Clerk <br /> <br /> <br />