My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1968-11-26
Charlottesville
>
City Council
>
Minutes
>
1968
>
1968-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2004 5:45:22 PM
Creation date
2/11/2004 5:39:33 PM
Metadata
Fields
Template:
City Council
Meeting Date
11/26/1968
Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF SAID STUDIES AND ITS JUDGMENT ON THE QUESTION, THAT TWO HIGH SCHOOLS <br />WOULD CONSTITUTE A BETTER SOLUTION TO THE PROBLEM OF EXPANDING SAID SYSTEM <br />THAN WOULD ONE HIGH SCHOOL, iN THAT TWO SCHOOLS WOULD PERMIT SMALLER ENROLL- <br />MENT IN A PARTICULAR SCHOOL~ WOULD LESSEN THE PROBLEMS OF TRANSPORTATION OF <br />PUPILS, AND WOULD PROVIDE A BETTER BASIS FOR FURTHER EXPANSION IN THE <br />FUTURE, AND~ <br /> <br /> WHEREAS, THE SAID SCHOOL BOARD HAS CAUSED TO BE PREPARED COST <br /> <br />ESTIMATES ON THE CONSTRUCTION OF TWO HIGH SCHOOLS FOR THE SYSTEM~ WHICH COST <br />ESTIMATES HAVE BEEN RESTUDIED AND THE TOTAL COSTS REDUCED, AS SHOWN IN.'THE <br />REPORT OF THE ARCHITECT PRESENTED TO SAID SCHOOL BOARD AT ITS MEETING ON <br />~7 OCTOBER, 1968, THE SAID REVISED COST ESTIMATES BEING IN THE JUDGMENT OF <br />THE SCHOOL BOARD THE LOWEST COST FOR ACCEPTABLE BUILDINGS WHICH CAN BE <br />OBTAINED~ AND~ <br /> <br />WHEREAS~ SAID SCHOOL BOARD HAS HERETOFORE REVIEWED WITH THE CiTY <br />COUNCIL THE ACQUISITION OF CERTAIN DESIGNATED SITES FOR THE TWO HIGH SCHOOLS, <br /> <br /> NOW, THEREFORE, BE IT RESOLVED, BY THE SCHOOL BOARD OF THE CITY OF <br />CHARLOTTESVILLE THAT THE CITY COUNCIL Of THE CITY OF CHARLOTTESVILLE BE~ AND <br />IT HEREBY tS, REQUESTED TO PROCEED WITH THE ACQUISITION OF THE TWO SITES FOR <br />HIGH SCHOOLS HERETOFORE DISCUSSED WITH CITY COUNCIL BY THE SCHOOL BOARD, IN <br />ACCORDANCE WITH A CERTAIN PLAT OR PLATS OF SAID SITES PRESENTED TO CITY COUNCIL <br />iN THE COURSE OF THE DISCUSSIONS HERETOFORE HENTIONED~ A COPY Of WHICH PLAT OR <br />PLATS IS HERETO ATTACHED~ AND~ <br /> <br /> BE IT FURTHER RESOLVED, BY THE SCHOOL BOARD OF THE CITY Of CHARLOTTES- <br />VILLE THAT THE CiTY COUNCIL OF THE CiTY OF CHARLOTTESVILLE BE, AND IT HEREBY IS, <br />REQUESTED TO AUTHORIZE THE SAID SCHOOL BOARD TO PROCEED WITH ALL NECESSARY STEPS' <br />TOWARD THE CONSTRUCTION OF TWO NEW HIGH SCHOOLS FOR THE CITY SCHOOL SYSTEM, <br /> <br />WHICH SAID CONSTRUCTION HAS BEEN ESTIMATED AS STATED ABOVE TO COST $6,984,~52.00, <br />WHICH ESTIMATED COST FIGURE INCLUDES ~80~000.00 FOR RELOCATION OF POWEr AND <br />UTILITY LINES~ BUT DOES NOT INCLUDE FUNDS TO MEET SITE ACQUISITION COSTS. <br /> <br />RESOLUTION RE: <br />FIVE YEAR BUILDING PLAN <br /> <br /> WHEREAS, THE SCHOOL BOARD OF THE CITY OF CHARLOTTESVILLE HAS <br />HERETOFORE REQUESTED FROM THE CITY COUNCIL OF THE CITY OF CHARLOTTESVILLE <br />AUTHORITY TO GO FORWARD WITH THE CONSTRUCTION OF ADDITIONAL HIGH SCHOOL <br />FACILITIES, AND, <br /> <br /> WHEREAS, IT IS THE DESIRE OF THE SCHOOL BOARD TO ACQUAINT CITY <br />COUNCIL FORMALLY WITH A STATEMENT OF THE FUTURE CONSTRUCTION PROPOSED BY <br />THE SCHOOL BOARD WITHIN THE FIVE YEAR BUILDING PLAN DERIVED FROM THE <br /> <br />PEABODY SURVEY OF THE SCHOOL SYSTEM OF THE CITY OF CHARLOTTESVILLE, VIRGINIA~ <br /> <br /> NOW, THEREFORE, BE IT RESOLVED, THAT THE CITY COUNCt L OF THE CITY <br />OF CHARLOTTESVILLE BE, AND IT HEREBY IS~ ADVISED THAT THE-FUTURE CONSTRUCTION <br />PROPOSED BY THE SCHOOL BOARD WITHIN THE FIVE YEAR BUILDING PERIOD AFORESAID <br />IS AS FOLLOWS: <br /> <br /> 1.) A NEW VOCATIONAL TRAINING CENTER TO BE CONSTRUCTED AND <br />OPERATED IN COOPERATION WITH THE COUNTY OF ALBEMARLE; <br /> <br /> 2.) THE RENOVATION OF THE PRESENT LANE HIGH SCHOOL AS A NEW <br /> <br />MIDDLE SCHOOL, TO BE UNDERTAKEN AFTER THE COMPLETION OF THE ADDITIONAL <br />HIGH SCHOOL FACILITIES FOR WHICH AUTHORITY FOR CONSTRUCTION HAS HERETOFORE <br />BEEN REQUESTED; <br /> <br />3.) RENOVATION TO EXISTING ELEMENTARY SCHOOLS AS NEEDED FOR <br />ADDITIONS T.O CURRICULA AND TO MEET THE NEEDS OF CHANGING SCHOOL POPULATION; <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.