Laserfiche WebLink
TO AUTHORIZE THE SAID SCHOOL BOARD TO PROCEED WITH ALL NECESSARY STEPS TOWARD <br /> <br />THE CONSTRUCTION OF TWO NEW HIGH SCHOOLS FOR THE CITY SCHOOL SYSTEM, AS SHOWN IN THE <br /> <br />tfSUMMARY AREA REQUIREMENTSu OF 7 JANUARY ~969~ WHICH SAID CONSTRUCTION~ AS SET OUT <br />ABOVE, HAS BEEN ESTIMATED TO COST $7,503,238.00, WHICH ESTIMATED COST FIGURE <br /> <br />INCLUDES $80~O00.O01'iFOR RELOCATION OF POWER AND UTILITY LINES, BUT DOES NOT <br /> <br />INCLUDE FUNDS TO MEET SITE ACQUISTION COSTS. <br /> <br /> HR. J. A. KESSLER) JR. ADDRESSED THE COUNCIL AND DISCUSSED THE RESOLUTION <br /> <br />AND ANSWERED QUESTIONS. A MOTION BY HR. RINEHART, SECONDED BY HR. VAN YAHRES <br /> <br />THAT THE CITY ATTORNEY BE REQUESTED TO PREPARE THE PROPER ORDINANCE CALLING A <br /> <br />REFERENDUM ON THE PROPOSED BOND 1;SSUE ON APRIL 22) 1969, WAS ADOPTED BY THE <br /> <br />FOLLOWING VOTE: AYES: HR. DAVIS) HR. RINEHART, HR. VAN YAHRES AND HR. VOGT. NOES: <br /> <br />HR, WRIGHT. <br /> <br /> THE FOLLOWING RESOLUTION WAS ALSO PRESENTED FROM THE SCHOOL BOARD: <br /> <br /> ~t]-~EREAS~ THE CITY SCHOOL BOARD HAS) IN ACCORDANCE WITH AUTHORIZATION <br /> <br />HERETOFORE GRANTED BY THE CITY COUNCIL, ENGAGED THE SERVICES OF CONSULTANTS <br /> <br />AND OF ARCHITECTS TO PROCEED WITH COST ESTIMATES FOR RENOVATION OF LANE HiGH <br /> <br />SCHOOL AND OF ELEMENTARY SCHOOLS AND OF COST ESTIMATES AND PRELIMINARY STUDIES <br /> <br />FOR TWO NEW HiGH SCHOOLS PROPOSED FOR THE CITY SCHOOL SYSTEM~ IN CONNECTION WITH <br /> <br />WHICH CITY COUNCIL HAS HERETOFORE AUTHORIZED AN EXPENDITURE OF UP TO $54,000.00 <br /> <br /> IN FEES AND EXPENSES TO SAID CONSULTANTS AND ARCHITECTS, AND) <br /> <br /> WHEREAS, THE SCHOOL BOARD HAS REQUESTED CITY COUNCIL FOR AUTHORITY TO <br /> <br />PROCEED WITH ALL NECESSARY FURTHER STEPS FOR THE CONSTRUCTION OF SAID TWO NEW <br /> <br /> HIGH SCHOOLS, AND~ <br /> <br /> ~'~EREAS) THE ARCHITECTS HAVE ADVISED THE SCHOOL BOARD THAT THEY CAN GO <br /> <br /> FORWARD iN THE PERIOD BETWEEN THE T~ME OF ACTION BY THE CITY COUNCIL ON THE SCHOOL <br /> <br />BOARD'S REQUEST TO PROCEED AND THE TIME OF ANY BOND REFERENDUM WHICH MAY BE <br /> <br />NECESSARY IN SUCH FASHION AS TO HAVE PREPARED BY THE TIME OF THE SAID BOND <br /> <br /> REFERENDUM PLANS CONSTITUTING THE DESIGN DEVELOPMENT STATE) AS DEFINED IN THE <br /> <br /> CONTRACT BETWEEN THE ~CHOOL BOARD AND THE ARCHITECTS, FOR THE TWO NEW HIGH SCHOOLS <br /> <br />WHICH CAN BE SUBMITTED TO THE STATE BOARD OF EDUCATION FOR PRELIHINARY APPROVAL, AND, <br /> <br /> WHEREAS, THE ARCHITECTS HAVE ADVISED THE SCHOOL BOARD THAT GOING FORWARD <br /> <br /> IN THE PREPARATION OF SAID DESIGN DEVELOPMENT STAGE DRAWINGS WILL REQUIRE, IN <br /> <br /> ACCORDANCE WITH THE FEE SCHEDULE WORKED OUT BETWEEN THE SCHOOL BOARD AND THE ARCHITECTS, <br /> <br /> AS SET OUT IN THEIR CONTRACT AFORESAI~D) AT THE COMPLETION OF THAT STAGE A SUM OF <br /> <br /> $t32,832.70 FOR FEES AND EXPENSES, OF WHICH SUM $54)000.00 AS AFORESAID HAS ALREADY <br /> <br /> BEEN APPROPRIATED~ AND) <br /> <br /> WHEREAS, OF THE $54,000.00 AFORESAID, THE SUM OF $362.50 HAS BEEN PAID <br /> <br /> AS A CONSULTANTtS FEE FOR SERVICES RENDERED IN CONNECTION WITH PLANS FOR RENOVATION <br /> <br /> OF LANE HIGH SCHOOL, AND IS NOT CHARGEABLE AGAINST THE AGREED-ON FEE OF THE <br /> <br /> ARCHITECTS FOR ARCHITECTURAL WORK ~O BE DONE IN CONNECTION WITH THE PROPOSED TWO <br /> <br /> NEW HIGH SCHOOLS~ AND THE SUM OF $27,000.00 HAS BEEN PAID TO THE ARCHITECTS FOR FEES <br /> <br /> AND EXPENSES IN CONNECTION WITH ARCHITECTURAL WORK FOR THE PROPOSED TWO NEW HIGH <br /> <br /> SCHOOLS, SO THAT THERE PRESENTLY REHAINS OF THE SAID $54,000.00 APPROPRIATION A <br /> <br /> BALANCE OF $26)637.50 WHICH CAN BE APPLIED TOWARD THE PAYMENT OF THE ARCHITECTURAL <br /> <br /> FEES AFORESAID OF $332~832.70~ LESS THE $27)000.00 HERETOFORE PAID, LEAVING A <br /> <br /> BALANCE OF $]05~832.70, FROM WHICH SHOULD BE SUBTRACTED THE PRESENT BALAN¢~ ON HAND <br /> <br /> OF $26,637.50, LEAVING A BALANCE REQUIRED FOR SAID FEE FOR THE WORK AS APORES.AID <br /> <br /> FOR THE TWO PROPOSED HIGH SCHOOLS OF ~79,t95.20, AND~ <br /> <br /> WHEREAS~ WAITING UNTIL AFTER THE BOND REFERENDUM WOULD~ BY THE BEST <br /> <br /> ESTIMATES OF THE ARCHITECT AND THE SCHOOL BOARD, MEAN THAT THE CONSTRUCTION OF <br /> <br /> <br />