Laserfiche WebLink
[1 <br />than fifty thousand cubic feet (50mcf) on the <br />peak month (as defined in the interim curtail. <br />Columbia Gas Transmission Corporation approve <br />Commission); provided: <br />(1) That such customers can be served <br />distribution mains; <br />of the <br />nt plan of the <br />by the Federal Power <br />exist <br />(2) That the total number of all classes of customers of <br />the city gas system shall in no event be permitted to <br />exceed 11,232, the number in service at the time of <br />imposition of the moratorium in March 1975; and <br />(3) That in the event the director of finance receives <br />applications for such residential or small commercial <br />service which would cause the limitation in subparagraph (2 <br />to be exceeded, he shall place such applicants on a waiting <br />list on a "first-come, first-served" basis, to be connected <br />if desired when additional connections become available <br />hereunder. <br />• <br />Copy Teste: <br />0 <br />Clerk <br />Adopted by the Council <br />September 16, 1977 <br />