My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005_Ordinances
Charlottesville
>
City Council
>
Ords Res App
>
Ordinances 1976-2009
>
2005_Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 11:29:08 AM
Creation date
3/30/2015 2:43:20 PM
Metadata
Fields
Template:
City Attorney
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
US. Route 250 Bypass, and then continuing east beneath U. S. Route 250 Bypass to the <br />• City limits at Free Bridge over the Rivanna River. Any additional installation of <br />equipment, lines, cables or other Facilities shall also be underground unless it shall be <br />determined by the Director as set forth in Article 111 that it is not feasible to do so. <br />SECTION 202 SUBSEQUENT INSTALLATION <br />202.1 SUBSEQUENT INSTALLATION MADE PURSUANT TO AN APPROVED PROW PLAN: <br />Additional Facilities installed within the PROW may be placed overhead or <br />underground pursuant to an approved request by the Company made pursuant to <br />Article III, and in accordance with such generally applicable ordinances or <br />regulations governing such installations that have been adopted by the City from <br />time to time. <br />202.2 GENERAL PREFERENCE FOR UNDERGROUND FACILITIES: As a matter of policy, <br />the City prefers that the installation of any Facility within the PROW occur <br />underground. Notwithstanding this preference, the City recognizes that in some <br />circumstances the placement of Facilities underground may not be appropriate. <br />Any additional installation of lines, cable, equipment or other Facilities shall be <br />underground unless it shall be determined by the Director, pursuant to Article III, <br />that it is not feasible to do so. <br />202.3 INSTALLATION OF OVERHEAD FACILITIES: Where a subsequent PROW plan is <br />• approved for overhead installation, the Company shall use its existing Facilities, <br />or those of another utility where available. If the PROW plan calls for overhead <br />installation and existing Facilities cannot accommodate the proposed installation, <br />the Company will clearly indicate in the PROW plan its intended placement of <br />new Facilities for the Director's review and consideration pursuant to Article III. <br />• <br />202.4 FUTURE ORDINANCES: Nothing herein shall be construed to limit the authority of <br />the city to adopt an ordinance that will restrict the placement of overhead lines for <br />all utilities using the PROW within a defined area of the City. <br />202.5 CONDITIONS FOR RELOCATING UNDERGROUND: The Company agrees that if, at <br />some future time, the telephone and other utility lines on the posts, poles, and <br />other overhead apparatus upon which the Company has placed some or all of its <br />Facilities in the City's PROWS are relocated underground, the Company will also, <br />at such time, relocate its Facilities on those posts, poles, and other overhead <br />apparatus underground at its expense. Notwithstanding the foregoing, the City <br />shall reimburse Company for any such relocation expense if such reimbursement <br />is required by Section 56-468.2 of the Code of Virginia, or other applicable law. <br />SECTION 203 INSPECTION BY THE CITY <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.