My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998_Resolutions
Charlottesville
>
City Council
>
Ords Res App
>
Resolutions 1976-2009
>
1998_Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 4:14:27 PM
Creation date
3/30/2015 2:47:02 PM
Metadata
Fields
Template:
City Attorney
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Design Review Process <br />These include: <br />• 1. Pick up an application at the Plan- <br />• repainting in a different color; <br />• addition or deletion of awnings, <br />ning Office in City Hall. Consider <br />shutters, canopies, storm windows <br />meeting with the zoning administra- <br />and doors, gutters and similar items; <br />for early in the process for informal <br />• all other structural changes which do <br />input and helpful technical informa- <br />not require issuance of a building <br />tion and also to fill out the applica- <br />permit; and <br />tion for the Board of Architectural <br />. approval of any signs for which ap- <br />Review (BAR). Consider presenting <br />proval is required by other sections <br />a conceptual design, particularly for <br />of the zoning ordinance. <br />an addition or a new building, to the <br />BAR before seeking formal approval. <br />5. <br />If the application is approved at the <br />staff level or by the BAR, you will <br />2. Fill out application and collect nec- <br />receive a letter approving the applica- <br />essary exhibits. The extent of these <br />tion and issuing a Certificate of Ap- <br />exhibits depends on the nature of the <br />propriateness or issuing a Certificate <br />project and could include elevation <br />of Appropriateness subject to certain <br />drawings, a site plan if applicable (for <br />conditions which will be stated in the <br />new construction or an addition), pho- <br />letter. After your Certificate of Ap- <br />tographs of the subject property/ <br />propriateness is approved you may <br />building, a sample of any exterior <br />apply for a building permit, if needed. <br />materials to be used on project such <br />as brick, siding; etc., color samples <br />6. <br />If the staff does not approve the ap- <br />• of paint to be used, and any <br />plication, you may apply to the BAR. <br />manufacturer's information on par- <br />The BAR is willing to work with ap- <br />ticular building products. There may <br />plicants in a preliminary conference <br />be a five-day waiting period depend- <br />and sometimes creates a subcommit- <br />ing on the type of submission. <br />tee to work directly with applicants. <br />3. Make ten copies of the application <br />7. <br />If the BAR does not approve the ap- <br />and return these with the necessary <br />plication, you may appeal to the City <br />exhibits to the Planning Office in <br />Council; if they do not approve it, you <br />City Hall. Return this information <br />may appeal to the Circuit Court. <br />seven calendar days before the next <br />scheduled meeting of the BAR, which <br />B. Additional Helpful Hints <br />is the third Tuesday of the month. <br />1. <br />Is your building income-producing, <br />4. If the application is complete, your <br />or will rehabcosts exceed 50% of <br />project will be placed on the agenda <br />the building's assessed value? If so, <br />of the next meeting or you will be in- <br />review the information on tax credits <br />formed if additional information is <br />to see whether you can qualify. <br />needed. Note: Some minor types of <br />2. <br />Review the Secretary of the <br />exterior alterations do not need to go <br />Interior's Standards for Rehabilita- <br />before the BAR and may be.approved <br />tion. These standards must be fol - <br />the same day of submission by the <br />lowed if you are using federal or state <br />staff of the Planning Department. <br />tax credits. They also are the basis of <br />2 Charlottesville Historic District Guidelines: Before You Begin Your Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.