My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005_Resolutions
Charlottesville
>
City Council
>
Ords Res App
>
Resolutions 1976-2009
>
2005_Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 4:00:06 PM
Creation date
3/30/2015 2:47:46 PM
Metadata
Fields
Template:
City Attorney
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project 0250-104-103,PE 101,RW 201,C 501,13 604 <br />UPC 60234 <br />is <br />5. Make the necessary notifications to the Environmental Protection Agency (EPA) for <br />any "improvements" made to sinkholes to facilitate storm water drainage. <br />6. Include in the contract documents and enforce all special provisions and <br />specifications related to the environment. <br />B. VDOT Shall: <br />1. Complete the Environmental Certification Checklist (EQ -103) and the Plans, <br />Specifications, & Estimates (PS&E) re-evaluation form (EQ -200) prior to approval <br />for advertisement and construction. This must be complete before FHWA will <br />authorize the plans, specifications, and estimates for construction. <br />2. Monitor the project in accordance with the DEPARTMENT'S Environmental <br />Monitoring Standard Operating Procedures to ensure environmental commitments <br />identified as a result of SERP and NEPA are implemented. <br />• <br />0 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.