My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008_Resolutions
Charlottesville
>
City Council
>
Ords Res App
>
Resolutions 1976-2009
>
2008_Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 3:38:16 PM
Creation date
3/30/2015 2:48:01 PM
Metadata
Fields
Template:
City Attorney
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />PUBLIC HEARING DESIGN ALTERNATIVE RESOLUTION <br />WHEREAS, numerous Public Hearings have been conducted in the City of Charlottesville <br />after due and proper notice for the purposes of considering the design of the McIntire Road <br />Extended Project U000-104-102, and for the Route 250 Bypass Interchange at McIntire Road <br />Project 0250-104-130, at which drawings and other pertinent information were made available for <br />public inspection in accordance with state and federal requirements; and <br />WHEREAS, all persons and parties in attendance were afforded full opportunity to <br />participate in said hearings; and <br />WHEREAS, representatives of the City of Charlottesville, were present and participated in <br />said hearings; and <br />WHEREAS, the Council has previously requested the Virginia Department of <br />Transportation to program both projects, the McIntire Road Extended Project and the Route 250 <br />Bypass Interchange at McIntire Road Project, into the Commonwealth's Six -Year Improvement <br />Program; <br />WHEREAS, the City has been working on the preliminary engineering phase of the Route <br />250 Bypass Interchange at McIntire Road Project for the last two years and Council has recently <br />selected Alternative GI with modified trail and straight girder bridge design as the preferred <br />• alternative and the request for construction bids is scheduled for April 2010; <br />WHEREAS, the Virginia Department of Transportation is currently finalizing the <br />construction plans and documents for the McIntire Road Extended Project and the request for <br />construction bids is scheduled for October 2008; <br />WHEREAS, the Council fully deliberated and considered all such matters; now <br />THEREFORE BE IT RESOLVED, in the spirit of cooperation and coordination for the <br />public good, that the Council of the City of Charlottesville hereby states its good faith intent to <br />move forward expeditiously in pursuance of a satisfactory grade -separated interchange design <br />which allows for a synchronized construction schedule and roadway opening date of said <br />interchange no later than six months after completion of the McIntire Road Extended Project. <br />Approved by Council <br />August 18, 2008 <br />G <br />-CIk of City Council <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.