Laserfiche WebLink
AN ORDINANCE AMENDING AND REENACTING SECTION 10-13 OF CHAPTER 10 OF THE CODE OF <br /> <br /> THE CITY OF CHARLOTTESVILLE, 1959, ENTITLED "INDIVIDUAL PERMITS FOR INSTALLATION OR ALTERATIONS - FEES". <br /> <br /> BE IT ORDAINED BY THE COUNCIL OF THE CITY OF CHARLOTTESVILLE THAT SECTION 10-13 OF <br /> <br />CHAPTER 10 OF THE CODE OF THE CITY OF CHARLOTTESVILLE, 1959, ENTITLED "INDIVIDUAL PERMITS <br /> <br /> FOR INSTALLATIONS OR ALTERATIONS - FEES" BE AND THE SAME IS HEREBY AMENDED AND REENACTED <br /> <br /> TO READ AS FOLLOWS: <br /> <br /> SECTION 10-13. INDIVIDUAL PERMITS FOR INSTALLATIONS OR ALTERATIONS - FEES. <br /> <br /> THE FOLLOWING FEES SHALL BE PAID TO THE CITY FOR EACH PERMIT ISSUED BY THE CITY ELECTRICIAN <br /> <br /> FOR THE INSTALLATION OR ALTERATION OF WIRING, EXCEPT AS PROVIDED IN SECTION 10-21 HEREAFTER, <br /> <br /> WITHIN THE CITY AND THE RECEIPT OF THESE FEES SHALL BE ENDORSED ON THE APPLICATION BY THE CITY ELECTRICIAN. <br /> <br /> WHEN THE ESTIMATED COST OF LABOR AND MATERIAL INVOLVED IN THE INSTALLATION, OR REPLACEMENT <br /> <br />OF ALL ELECTRIC WIRES, CORDS, CABLES, RACEWAYS, BUSWAYS, BOXES, CABINETS, GUTTERS, TROUGHS, <br /> <br />FITTINGS, SWITCHES, DEVICES, CIRCUIT BREAKERS, CONTROLLERS, RELAYS; SIGNAL, TIME, TEMPERATURE <br /> <br />AND COMMUNICATION EQUIPMENT; OVERCURRENT DEVICES, RECEPTACLES, LAMPHOLDERS; LIGHTING FIXTURES, <br /> <br />FITTINGS AND ACCESSORIES; PANELBOARDS, SWITCHBOARDS, SWITCHGEAR, TRANSFORMERS, BATTERIES, <br /> <br />RESISTORS, REACTORS, RECTIFIERS, CONTROL AND DISTRIBUTION CENTERS; LIGHT POST AND STANDARDS, <br /> <br />POLES AND ACCESSORIES, AND OTHER NONELECTRICAL MATERIALS USED IN CONJUNCTION THEREWITH, BUT <br /> <br /> EXCLUDING THE COST OF LABOR AND MATERIALS INVOLVED IN THE INSTALLATION, OR REPLACEMENT OF <br /> <br />APPLIANCES, MOTORS, GENERATORS, MACHINERY AND SIMILAR EQUIPMENT THE FEE SHALL BE: <br /> <br /> WHEN ESTIMATED COST IS $ 1.00 BUT DOES NOT EXCEED 15.00 PERMIT FEE $ 1.00 <br /> 15.01 TO 50.00 2.00 <br /> 50.01 TO 75.00 3.00 <br /> 75.01 TO 100.00 4.00 <br /> 100.01 TO 150.00 6.00 <br /> 150.01 TO 200.00 8.00 <br /> 200.01 TO 250.00 10.00 <br /> 250.01 TO 300.00 12.00 <br /> 300.01 TO 400.00 15.00 <br /> 400.01 TO 500.00 18.00 <br /> 500.01 TO 1,000.00 20.00 <br /> 1,000.01 TO 2,000.00 25.00 <br /> 2,000.01 TO 3,000.00 30.00 <br /> 3,000.01 TO 4,000.00 35.00 <br /> 4,000.01 TO 5,000.00 40.00 <br /> <br /> WHEN COST EXCEEDS $5,000.00 ------------------------ $40.00 PLUS $2.00 FOR EACH ADDITIONAL <br /> <br /> $1,000.00 OR FRACTION THEREOF, IN NO EVENT EXCEEDING $500.00. <br /> <br /> ALL SUCH ELECTRICAL PERMITS SHALL BE ISSUED UPON PAYMENT OF A FEE BASED ON THE <br /> <br /> ESTIMATED TOTAL PHYSICAL VALUE AS HEREINABOVE SET FORTH. UPON COMPLETION OF THE <br /> <br />WORK FOR WHICH SUCH A PERMIT IS ISSUED, AN ACCURATE STATEMENT OF THE ACTUAL COST <br /> <br />THEREOF SHALL BE FURNISHED TO THE CITY ELECTRICIAN BY THE PARTY TO WHOM THE PERMIT <br /> <br />WAS ISSUED; AND THEREUPON ADJUSTMENT OF THE DIFFERENCE BETWEEN THE FEE PROPERLY <br /> <br />CHARGEABLE, BASED ON THE ACTUAL COST, AND THE FEE PAID, BASED ON THE ESTIMATED TOTAL <br /> <br /> PHYSICAL VALUE, SHALL BE MADE. IF THE ACTUAL COST EXCEEDS THE ESTIMATED COST, THE PARTY <br /> <br /> TO WHOM THE PERMIT WAS ISSUED SHALL PAY THE DIFFERENCE IN FEE; IF THE ACTUAL COST BE LESS <br /> <br /> THAN THE ESTIMATED COST, THEN THE CITY DIRECTOR OF FINANCE IS HEREBY AUTHORIZED, UPON <br /> <br />REQUEST OF THE CITY ELECTRICIAN TO REFUND TO THE PARTY, BY WHOM THE ESTIMATED FEE WAS PAID, <br /> <br />SUCH PORTION THEREOF AS CONSTITUTES AN OVERPAYMENT. <br /> <br /> THIS ORDINANCE SHALL BECOME EFFECTIVE ON MARCH 1, 1961. <br /> <br /> ADOPTED BY THE COUNCIL <br /> FEBRUARY 6, 1961 <br /> AYES: MR. HAGGERTY, MR. LEE, MR. MICHIE, <br /> MR. MOUNT AND MR. SCRIBNER <br /> NOES: NONE <br /> CLERK PRESIDENT <br /> <br />