My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINUTES 1951
Charlottesville
>
City Council
>
Minutes
>
MINUTE BOOK I_APRIL 1 1947-AUGUST 31 1953_COUNCIL
>
MINUTES 1951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 11:44:51 AM
Creation date
9/21/2021 7:10:23 PM
Metadata
Fields
Template:
City Council
Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE NECESSITY OF INCREASING THE WATER SUPPLY IN THIS SECTOR AND <br />RECOMMENDED THAT A 12" MAIN TRUNK LINE BE INSTALLED ALONG RUGBY <br />MATTER RE: ROAD FROM THE C & O RAILROAD BRIDGE NORTH TO THE CITY LIMITS, <br />RUGBY RD. MATER LINE <br />AND THAT THE VARIOUS SUBSIDARY DISTRIBUTION LINES BE CONNECTED <br />TO THE MAIN TRUNK LINE IN ORDER TO ALLEVIATE AN UNFAVORABLE <br />EXISTING CONDITION. IT WAS ESTIMATED THAT THE COST OF THIS <br />PROJECT WOULD BE 6759000.00. ON MOTION BY BARRY SECONDED BY <br />MR. TE BELL , THE FOLLOW 1 NG RESOLUT 10N WAS OF FERED AND CARR i ED OVER <br />FOR CONSIDERATION: <br />THE OWNER OF A SUBDIVISICN OR APPLICANT ON UNACCEPTED STREET <br />SHALL BE REQUIFED TO DEPOSIT WITH THE CITY THE TOTAL COST OF THE <br />UTILITY LINES EXCLUSIVE OF THE EXTRA COST FOR THE LARGER LINES. <br />BEFORE ANY PORTION OF THE LINES ARE INSTALLED. ONE—HALF OF THE <br />AMOUNT DEPOSITED SHALL BE RETURNED TO THE SUBDIVIDER AS SOON AS <br />HE HAS COMPLETED CONSTRUCTION OF THE STREETS WITHIN THE SUB— <br />DIVISION IN A MANNER ACCEPTABLE BY THE COUNCIL. <br />IN DEDICATED AND ACCEPTED STREETS - <br />WATER AND GAS: <br />• <br />EACH APPLICANT FOR A WATER OR GAS SERVICE REQUIRING AN <br />EXTENSION OF THE MAIN LINE IN A STREET HERETOFORE ACCEPTED AND <br />MAINTAINED BY THE CITY SHALL BE ALLOWED A 100 FOOT EXTENSION <br />FREE OF CHARGE. ANY EXTENSION BEYOND THE ALLOWED 100 FEET SHALL <br />BE INSTALLED BY THE CITY AND THE TOTAL ESTIkATED COST THEREOF <br />SHALL BE PAID FOR BY THE APPLICANT PRIOR TO THE INSTALLATION <br />OF THE L I NE. THE ESTIMATED COST OF THE EXTENSION TO BE BASED <br />ON USING 211 PIPE EVEN THOUGH THE CITY CHOOSES TO INSTALL A <br />LARGER SIZE PIPE. <br />R+ • <br />EACH APPLICANT FOR A SEWER CONNECTION REQUIRING AN EXTENSION <br />OF THE MAIN LINE SHALL PAY IN ADVANCE ONE—HALF OF THE ESTIMATED <br />COST OF THE TOTAL EXTENSION IF THE EXTENSIC14 IS TO SERVE MORE <br />THAN ONE BUILDING OR POTENTIAL BUILDING SITE. IF THE PROPOSED <br />EXTENSION CAN SERVE ONLY ONE BUILDING OR SITE THE TOTAL ESTIMATED <br />COST OF THE LINE SHALL BE PAID FOR JN ADVANCE BY THE APPLICANT. IN <br />ADDITION TO THE FOREGOING THE APPLICANT SHALL BE REQUIFED TO PAY <br />THE USUAL SEWER CONNECTION CHARGE. ESTIMATES FOR SEWER LINE <br />EXTENSIONS SHALL BE BASED ON USING PIPE NOT GREATER THAN 8" IN <br />SIZE. <br />• RESPECTFULLY SUBMITTED$ <br />C._K, X. T E B LL (S I G N E D_1 <br />JIM EOWEL) SIGNEPJ <br />BE IT RESOLVED BY THE COUNCIL OF THE CITY OF <br />RESOLUTION RE: APPROP. <br />CHARLOTTESVILLE THAT 1,,759000.00 OR AS MUCH THEREOF <br />WATER MAIN RUGBY RD. <br />CARRIED OVER <br />AS MAY BE NECESSARY1 BE AND THE SAME IS HEREBY APPROPRIATED <br />TO INSTALL A 12" WATER MAIN ALONs RUGBY ROAD. <br />THE FOLLOWING RECOMMENDATION OF THE UTILITIES COMMITTEE <br />• <br />WAS PRESENTED: <br />NOVEMBER 2, 1951 <br />TO THE MEMBERS OF THE COUNCIL <br />CITY OF CHARLOTTES` ILLE9 VIRGINIA <br />© <br />GENTLEMEN: <br />YOUR COMMITTEE ON UTILITIES RESPECTFULLY RECOMMENDS THAT <br />THE FOLLOWING POLICY ON WATERS GAS AND SEWER LINE EXTENSIONS <br />BE ADOPTED: <br />IN SURD 1 V I S I ONS OR IN DED CATER BUT U_NAC EPTED SIREElS - <br />THAT ALL WATERP GAS AND SEWER LINES IN SUBDIVIISIONS AND/ <br />OR DEDICATED BUT UNACCEPTED STREETS BE INSTALLED BY THE CITYV <br />AFTER APPROVAL BY THE COUNCIL, AND THAT THE COST THEREOF BE <br />UTILITIES COMMITTEE <br />DIVIDED EQUALLY BETWEEN THE PROPERTY OWNER AND THE CITY. SUCH <br />REPORT RE: <br />DIVISION OF COSTS TO BE DETERMINED ON THE BASIS OF AN ESTIMATE <br />UTILITIES EXTENSIONS <br />PREPARED BY THE CITY ENGINEERING DEPARTMENT PRIOR TO THE <br />INSTALLATION OF THE UTILITIES9 AND USING PIPE OF SIZE AND <br />QUALITY RECOMMENDED BY THE CITY UP TO C INCH WATER, E INCH GAS, <br />AND 8 INCH SEVER. IF PIPE OF GREATER SIZE THAN THE FOREO 1 NG <br />ARE REQUIRED FOR FUTURE EXTENSICNS AND GROWTHS THE EXTRA COST <br />IS TO BE ABSORBED BY THE CITY. <br />THE OWNER OF A SUBDIVISICN OR APPLICANT ON UNACCEPTED STREET <br />SHALL BE REQUIFED TO DEPOSIT WITH THE CITY THE TOTAL COST OF THE <br />UTILITY LINES EXCLUSIVE OF THE EXTRA COST FOR THE LARGER LINES. <br />BEFORE ANY PORTION OF THE LINES ARE INSTALLED. ONE—HALF OF THE <br />AMOUNT DEPOSITED SHALL BE RETURNED TO THE SUBDIVIDER AS SOON AS <br />HE HAS COMPLETED CONSTRUCTION OF THE STREETS WITHIN THE SUB— <br />DIVISION IN A MANNER ACCEPTABLE BY THE COUNCIL. <br />IN DEDICATED AND ACCEPTED STREETS - <br />WATER AND GAS: <br />• <br />EACH APPLICANT FOR A WATER OR GAS SERVICE REQUIRING AN <br />EXTENSION OF THE MAIN LINE IN A STREET HERETOFORE ACCEPTED AND <br />MAINTAINED BY THE CITY SHALL BE ALLOWED A 100 FOOT EXTENSION <br />FREE OF CHARGE. ANY EXTENSION BEYOND THE ALLOWED 100 FEET SHALL <br />BE INSTALLED BY THE CITY AND THE TOTAL ESTIkATED COST THEREOF <br />SHALL BE PAID FOR BY THE APPLICANT PRIOR TO THE INSTALLATION <br />OF THE L I NE. THE ESTIMATED COST OF THE EXTENSION TO BE BASED <br />ON USING 211 PIPE EVEN THOUGH THE CITY CHOOSES TO INSTALL A <br />LARGER SIZE PIPE. <br />R+ • <br />EACH APPLICANT FOR A SEWER CONNECTION REQUIRING AN EXTENSION <br />OF THE MAIN LINE SHALL PAY IN ADVANCE ONE—HALF OF THE ESTIMATED <br />COST OF THE TOTAL EXTENSION IF THE EXTENSIC14 IS TO SERVE MORE <br />THAN ONE BUILDING OR POTENTIAL BUILDING SITE. IF THE PROPOSED <br />EXTENSION CAN SERVE ONLY ONE BUILDING OR SITE THE TOTAL ESTIMATED <br />COST OF THE LINE SHALL BE PAID FOR JN ADVANCE BY THE APPLICANT. IN <br />ADDITION TO THE FOREGOING THE APPLICANT SHALL BE REQUIFED TO PAY <br />THE USUAL SEWER CONNECTION CHARGE. ESTIMATES FOR SEWER LINE <br />EXTENSIONS SHALL BE BASED ON USING PIPE NOT GREATER THAN 8" IN <br />SIZE. <br />• RESPECTFULLY SUBMITTED$ <br />C._K, X. T E B LL (S I G N E D_1 <br />JIM EOWEL) SIGNEPJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.