Laserfiche WebLink
ACCOMPLISHMENTS <br />•Proactive investment in infrastructure to minimize long-term operational costs and emergency expenditures. <br />•Balancing reliable, first-rate services with utility rates that are fair and considered a good value. <br />22.9 miles <br />12.8% of the <br />water system has been replaced <br />$30.6 million total <br />construction cost <br />65.1 miles <br />38.5% of the <br />wastewater system has been replaced/rehabilitated <br />$33.6 million total <br />construction cost <br />14.7 miles <br />11.3% of the <br />stormwater system has been replaced/rehabilitated <br />$11.8 million total <br />construction cost <br />Page 25 of 171